Steps to meet power shortage
14 Aug 2007
The working group on power for the eleventh plan (2007-12) has estimated a total fund requirement of about Rs. 1,031,600 crore for the power sector as a whole.
For creation of projected capacity addition, fund requirement has been assessed at about Rs. 4,10,900 crores by the working group on power. Out of the now proposed capacity addition of about 78500 MW, 1870 MW has already been commissioned and another 50,975 MW is under construction.
Power Finance Corporation and Rural Electrification Corporation have geared up to mobilize funds to ensure that viable projects do not suffer for want of funds. Further, to facilitate financial closure for private sector projects, an inter institutional group, comprising leading financial institutions and banks, is functional.
However, for equity contribution for private sector projects, the developers have to make arrangements from their internal resources, while for meeting the equity requirements in respect of central and state sector projects, public sector undertaking/utilities have to make arrangements from their internal resources and /or budgetary support.
With the projected capacity in place and through energy conservation measures, the gap between demand and supply of electricity is likely to be bridged gradually during the course of the 11th Plan.
This
information was given by the power minister Sushilkumar
Shinde in a written reply to a question in the Rajya Sabha
today.
Latest articles
Featured articles
Server CPU Shortages Grip China as AI Boom Strains Intel and AMD Supply Chains
By Cygnus | 06 Feb 2026
Intel and AMD server CPU shortages are hitting China as AI data center demand surges, pushing lead times to six months and driving prices higher.
Budget 2026-27 Seeks Fiscal Balance Amid Rupee Volatility and Industrial Stagnation
By Cygnus | 02 Feb 2026
India's Budget 2026-27 targets fiscal discipline with record capex as markets tumble, the rupee weakens and manufacturing struggles to regain momentum.
The Thirsty Cloud: Why 2026 Is the Year AI Bottlenecks Shift From Chips to Water
By Axel Miller | 28 Jan 2026
As AI server density surges in 2026, data centers face a new bottleneck deeper than chips — the massive water demand required for cooling next-generation infrastructure.
The New Airspace Economy: How Geopolitics Is Rewriting Aviation Costs in 2026
By Axel Miller | 22 Jan 2026
Airspace bans, sanctions and corridor risk are forcing airlines into costly detours in 2026, raising fuel burn, reducing aircraft utilisation and pushing airfares higher worldwide.
India’s Data Center Arms Race: The Battle for Power, Cooling, and AI Real Estate
By Cygnus | 22 Jan 2026
India’s data centre boom is turning into an AI arms race where power contracts, liquid cooling and fast commissioning decide the winners across Mumbai, Chennai and Hyderabad.
India’s Oil Balancing Act: Refiners Rebuild Middle East Supply Lines as Russia Flows Disrupt
By Axel Miller | 21 Jan 2026
India’s refiners are rebalancing crude sourcing as Russian imports fell to a two-year low in December 2025, lifting OPEC’s share and raising geopolitical risk concerns.
Arctic Fever: How ‘Greenland Tariff’ Politics Sparked a Global Flight to Safety
By Axel Miller | 20 Jan 2026
Greenland-linked tariff threats have injected fresh uncertainty into transatlantic trade, triggering a risk-off shift in markets and reshaping global supply chain planning.
The New Oil (Part 5): Friend-Shoring, Supply Chain Fragmentation and the Cost of Resilience
By Cygnus | 19 Jan 2026
Friend-shoring is reshaping lithium, rare earth and graphite supply chains, creating a resilience premium and new winners and losers in clean tech.
The New Oil (Part 4): Can Technology Break the Dependency?
By Cygnus | 16 Jan 2026
Can magnet recycling and rare-earth-free motors reduce global dependence on strategic minerals? Part 4 explores breakthroughs, limits and timelines.

