Fund crunch puts TeamIndus’s Moon mission in limbo

10 Jan 2018

The total cost of the mission was estimated to be Rs450 crore, of which TeamIndus managed to raise about Rs225 crore, and has to secure the remaining within the launch deadline of March 2018

Isro sets 10 January for another mega launch of 31 satellites

30 Dec 2017

The first space mission in 2018, which will use Isro’s workhorse Polar Satellite Launch Vehicle (PSLV-C40), comes four months after an earlier mission on 31 August failed to deliver the country's eighth navigation satellite, IRNSS-1H

Isro plans to launch at least one satellite every month in 2018

01 Dec 2017

India's second Moon mission set for March 2018

25 Oct 2017

Isro's second unmanned Moon mission, Chandrayaan-2, an advanced version of Chandrayaan-1, will use an orbiter, lander and a rover

Railways looks at Isro technology to enhance rail safety

29 Sep 2017

After probing IRNSS flop, ISRO to resume satellite launches by December

18 Sep 2017

Isro’s IRNSS satellite launch fails

01 Sep 2017

Isro to launch back-up satellite for NavIC navigation system

12 Aug 2017

Isro, NPL sign MoU for time synchronisation of desi GPS

04 Aug 2017

While the MoU will help the GPS align more accurately with Indian time, the indigenous GPS may take couple of years to become fully operational

ESA’s Ariane 5 rocket places India's GSAT-17 in orbit

29 Jun 2017

GSAT-17, which will strengthen India’s current fleet of telecommunication satellites, is the third satellite launch by Isro this month - the other two being first developmental flight of GSLV MkIII and PSLV C-38 missions — both from Sriharikota spaceport

View details about the software product Informachine News Trackers