Deadline for registration of electronics units extended to 3 July

23 Mar 2013

1

The Department of Electronics and Information Technology (DeitY) has extended the date of implementation of compulsory registration for units producing electronic goods for a period of three months beyond 3 April 2013.

Accordingly, the 'Electronics and IT Goods (Requirement of Compulsory Registration) Order, 2012', will come into effect on 3 July 2013.

Units, which do not comply with the order by 3 July 2013 can seek a further extension for three months after paying a fee.

Manufacturing units that submit the products to the BIS recognised labs before 3 July 2013, but fail to provide test reports, would have to pay a fee on a per month basis at the specified rates, till they submit request for registration to BIS with complete test reports.

Units that fail to submit the products to BIS-recognised labs before 3 July 2013, will be levied a monthly fee three times the rates specified, till they submit their samples for testing and after that a monthly fee at prescribed rates till they submit request for registration to BIS with complete test reports.

In any case, no extension will be granted to units beyond 3 October 2013, the release added.

Latest articles

China urges Iran to ensure navigation safety in Strait of Hormuz

China urges Iran to ensure navigation safety in Strait of Hormuz

Widebody ambition: El Al expands Boeing 787 fleet to strengthen long-haul strategy

Widebody ambition: El Al expands Boeing 787 fleet to strengthen long-haul strategy

India’s electronics exports to China rise, but Apple-linked surge figures need caution

India’s electronics exports to China rise, but Apple-linked surge figures need caution

Carmakers explore energy storage, but claims of major pivot and write-downs are overstated

Carmakers explore energy storage, but claims of major pivot and write-downs are overstated

Government advances Dholera semiconductor hub, but timelines and scale claims need caution

Government advances Dholera semiconductor hub, but timelines and scale claims need caution

South Korea’s AI chip push grows, but 2nm robotics claims remain premature

South Korea’s AI chip push grows, but 2nm robotics claims remain premature

India–Japan chip collaboration grows, but details around Axiro–EdgeCortix deal remain limited

India–Japan chip collaboration grows, but details around Axiro–EdgeCortix deal remain limited

Post-splashdown: What Artemis II taught us about the ‘deep space wall’

Post-splashdown: What Artemis II taught us about the ‘deep space wall’

Carmakers explore energy storage, but claims around Ford and GM pivot remain overstated

Carmakers explore energy storage, but claims around Ford and GM pivot remain overstated