AAI plans revamp of Himalayan airports
11 May 2006
The Airport Authority of India (AAI) has earmarked a total of Rs2547.71 lakh for the development of Kullu and Kangra airports and an amount of Rs98.29 lakh for the development of Shimla airport.
AAI has taken up upgradation works for construction of a new terminal building for 100 passengers at a time with all amenities, a new apron to accommodate 3 ATR-42 type of aircraft, a new taxiway, a new fire station, an MT workshop and a car park etc at the Kullu-Manali airport. Work on the apron and taxiway has been completed, and that on the new terminal building is likely to be completed by 30 June, 2006.
Various development works have been undertaken at the Kangra (Dharamshala) airport and new control tower cum technical block is under construction and is likely to be completed by 30 June 2006. These include strengthening and extension of runway, construction of a new apron for the parking of two 50-seater aircraft with a link taxiway, construction of a new terminal building for 100 passengers with a car park, a new fire station, etc.
Latest articles
Featured articles
The New Oil (Part 4): Can Technology Break the Dependency?
By Cygnus | 16 Jan 2026
Can magnet recycling and rare-earth-free motors reduce global dependence on strategic minerals? Part 4 explores breakthroughs, limits and timelines.
India’s Gig Economy Reset: The End of ‘10-Minute Delivery’ Hype?
By Cygnus | 14 Jan 2026
India’s quick-commerce sector is shifting away from “10-minute delivery” hype amid worker safety concerns and rising regulation. Here’s what changes—and what doesn’t.
AI Is Becoming the New Electricity Crisis: Why the Real Bottleneck Is Megawatts
By Axel Miller | 14 Jan 2026
AI is turning into an electricity crisis as data centres scale from chips to megawatts. Grid bottlenecks, copper demand and cooling limits are now the real AI constraints.
The New Oil: Can Technology End the Rare Earth Dependency?
By Cygnus | 14 Jan 2026
Magnet recycling and rare-earth-free motors are emerging as technology escape routes from critical mineral dependency. But timelines are slower than the hype suggests.
The New Oil: Inside the Processing Gap — Why Mining Alone Won’t Fix the Critical Minerals Crisis
By Cygnus | 13 Jan 2026
Mining isn’t the real bottleneck in critical minerals. The 2026 processing gap — refining, separation and chemical conversion — is the chokepoint reshaping global supply chains, industrial policy and geopolitics.
The Battle for the Skies: Air India’s Widebody Bet vs IndiGo’s XLR Gambit
By Cygnus | 12 Jan 2026
Air India vs IndiGo fleet strategy 2026: Air India expands with new Boeing 787-9 widebodies while IndiGo uses A321XLR efficiency and IndiGoStretch to reshape long-haul economics.
The Custom Dreamliner: Air India Reclaims Its Skies with First Post-Privatisation 787-9
By Axel Miller | 12 Jan 2026
Air India’s comeback under Tata enters a new phase as its first post-privatisation custom Dreamliner strengthens the fleet renewal push for premium long-haul travel.
The New Oil: How the 2026 lithium and graphite bottleneck could stall global EV growth
By Cygnus | 12 Jan 2026
Lithium and graphite are emerging as the key EV bottlenecks in 2026 as South America expands mining while China dominates processing and battery-grade conversion.
The New Oil: How the 2026 Rare Earth Shock Is Reshaping the Global Economy
By Cygnus | 09 Jan 2026
Japan launches a 6,000m deep-sea mission as China restricts rare earth exports. Discover how the 2026 “New Oil” crisis is redefining global high-tech trade.
